In this case study, we illustrate how our Asset Health Management for Generators solution assists a South African municipality in taking control and proactively managing more than 200 generators ranging from 30kVa to 2000kVA. These generators are spread over a vast geographical area and are utilised by plants, pump stations and administration buildings.
Due to South Africa’s primary power supplier running an increased load shedding schedule, continuous energy supply to the operational departments are under threat. The need for generators increase dramatically, and the subsequent equipment availability is critical to start up and run at full capacity within seconds.
More content
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | OEM | Baking Equipment | After Sales Service | Debtor Management | On Key Syspro Interface
Part of our client’s after-sales offering to the market is to have qualified technicians not…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Client Reference | Mining | Coal | Customisation of Asset Tactics
The outputs of the customisation process included a more accurate budget on renewals or the…
Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow
Shell is a national supplier of petroleum products and have a proud record of presenting…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…