Our client has better control over breakdowns and appropriate escalation processes is in place in the Rear Axle Area. In year one, there was an average of between 60 and 70 breakdowns in a 4-week period. From Calendar Week 20 –23 in year two, there were only 39 breakdowns in the Rear Axle Area and a downtime of 36 minutes. (Decrease of 35-45% in the number of breakdowns).
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
More content
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Coal | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Client Reference Story | Local Government Municipality | Generator On-Line Dashboard User Guide
In this case study, we illustrate how our Asset Health Management for Generators solution assists…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Client Reference | Distributed Facilities | Value Add in Gauteng Retail Outlets
The client is one of the largest retailers on the African continent. They have an…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
