Our client has better control over breakdowns and appropriate escalation processes is in place in the Rear Axle Area. In year one, there was an average of between 60 and 70 breakdowns in a 4-week period. From Calendar Week 20 –23 in year two, there were only 39 breakdowns in the Rear Axle Area and a downtime of 36 minutes. (Decrease of 35-45% in the number of breakdowns).
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
More content
Case Study | OEM | MacAdams | AMIP
Without Pragma’s involvement, we would only have been able to come up with 10% of…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Client Reference | Distributed Facilities | Retail | SLA driven performance
Our client is a large supermarket retailer in Africa, operating over 2,500 outlets under 15…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Case Study | Local Government | Municipality | Maintenance Capacity Planning
Our client fulfils a maintenance support function to all divisions within their organisation. The client…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
