On Key is a cost saver because it allows us to become completely paperless and is a great time saver because it allows us to schedule and allocate work in bulk. It’s a good tool to manage staff utilisation and, as a result, reduce overtime.
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
More content
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Client Reference Story | Local Government Municipality | Generator On-Line Dashboard User Guide
In this case study, we illustrate how our Asset Health Management for Generators solution assists…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Client Reference | Mining | Providing a structured, role-based approach to skills development
Our client’s requirement for support with the training and development of their asset management resources…
Client Reference | Mining and Minerals | Processing | AMIP and Strategy Development for Plants across the Globe
The client s a globally diversified mining and metals company with headquarters in Australia with…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Case Study | Oil and Gas Retail | Shell | Follow Up Work Orders | On Key
Convenient to electronically capture which assets need repairs while on site and peace of mind…
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
