Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel pumps from 2012 to 2016.
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
More content
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy
The intent was to create a common understanding of maintenance management among all plant engineers…
Client Reference | Manufacturing | Automotive | Implementing the Pragma Way
At our company our goal is to align people’s ambitions to plant strategy, ensuring that…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…