Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Quarries | EAM system optimisation
PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Client Reference | Manufacturing | Mechanical Condition Assessment | High Volume Printing
A specialised printing entity providing services to government stakeholders realised the need for reliability improvement…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…