Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to be approximately 1.5 million pula per annum.
Diamonds | Cascade conveyors
More content
Client Reference | Manufacturing | Mechanical Condition Assessment | High Volume Printing
A specialised printing entity providing services to government stakeholders realised the need for reliability improvement…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis
By defining and documenting failure modes across 32 asset types, the client achieved a structured…
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
Pragma’s intervention has led to an increase in the number of units completed per day…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | Mining and Minerals | Processing | AMIP and Strategy Development for Plants across the Globe