The ACC provided a platform for the staff at ESS to be able to easily detect priority work, work that was falling behind and the status of any job at any time.
Municipality | Sub-station maintenance
More content
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | Oil and Gas Retail | Shell | Supplier Savings
The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,…
Case Study | Productie Voedingsindustrie | C&D Foods | On-Key-implementatie
Pragma ondersteunt het onderhoudsprogramma On-Key van C&D en stelt het management in staat beter inzicht…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…