Since the implementation of the initiative, the statutory SLA for work orders completed increased from an average of 66% per month to an average of 94% per month.
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
More content
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Case Study | Oil and Gas | Retail Sites | FI Generator | Life Cycle Management
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Local Government | Fleet Management | Insurance Management Tool
Our client required an insurance management tool to manage and report on insurance claims and…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…