Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Reference story | Water utility | SAP® PM optimisation
More content
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Distributed Facilities | Office Management | Curo Fund Services | Contractor Management and Work Processes
This is how we reduced our client’s printing paper usage by 25% and reduced their…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Client Reference | Local Government | Municipality | Fleet Management Service
Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance…
Case Study | Retail | Massmart | Making informed decisions, increasing efficiency and saving costs
Massmart is a South African based globally competitive regional management group, invested in a portfolio…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Manufacturing Automotive | Improved Operator Asset Care in Body Shop
By empowering our cell technicians to perform routine non tactical maintenance tasks we have not…