By defining and documenting failure modes across 32 asset types, the client achieved a structured maintenance approach and expects to reduce future unplanned costs by R4.4 million.
Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis
More content
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Case Study | Oil and Gas Fuels Retail | Lowering Carbon Emissions
As part of Shell securing its position as the leading global mobility retailer, they have…
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Case Study | Mining and Minerals | Petra Diamonds | Centralising Asset Tree using a Placeholder Import in On Key
Petra Diamonds is a leading independent diamond producer with one of the worlds largest diamonds…
Client Reference | Distributed Facilities | Value Add in Gauteng Retail Outlets
The client is one of the largest retailers on the African continent. They have an…
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
