See how structured, value-based spare parts optimisation delivered over 34% IRR (and more than 140% in targeted areas), while improving uptime visibility, reducing risk, and freeing up working capital.
Client Reference | CRS Local Government Hydro Power Station – Spare Parts Optimisation
More content
Reference story | Municipality | Asset Care Plans on SAP® PM
ACP’s are being identified and implemented in accordance to the asset management strategy.
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,…
Case Study | OEM | MacAdams | AMIP
Without Pragma’s involvement, we would only have been able to come up with 10% of…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…