It was a big help to get all the maintenance recommendations from the different equipment manufacturers converted perfectly to the standard and implement them in On Key. All the spares have also been made available in the global system and from there in the different market companies. It was a job very well done I would continue this way each time.
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
More content
Client Reference | Mining Coal | FI on LDV Maintenance Costs
This focused intervention will help me to have more control over my costs and to…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Client Reference | Manufacturing | Automotive | Asset Care Development Strategy Implementation
The asset care development plan was successfully implemented and achieved a maturity level of >71%…
Client Reference | Manufacturing | Automotive | Integrating the Pragma Way
The client gained improved asset management maturity with individuals taking ownership and accountability for completing…
