Focused interventions do not necessarily always have to lead to complex solutions where redesign or process changes are required. Maintaining the operational environment and the asset maintenance requirements and best practices are the ‘low-hanging fruits’ that can easily be rectified resulting in the designed performance of the asset.
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
More content
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Quarries | EAM system optimisation
PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to…
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Client Reference | Manufacturing | Glass | Improvement of Asset Care Plan
Our client is a leading manufacturer and supplier of float glass, laminated glass and mirrors…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…