- 50% decrease in turn around time to complete work orders
- Accurate and up to date asset register
- Better control over technical and soft service contractors
Case Study | Distribution Facilities | Retail | Pepkor
More content
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Client Reference | Mining | Coal | Customisation of Asset Tactics Navigation
Our client has a coal open cast mine, with one DMS plant for the beneficiation…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy
The intent was to create a common understanding of maintenance management among all plant engineers…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…
