To improve the process of removing the moisture in the transformer oil, a filtration method was implemented with the transformer in operation to use the service temperature to drive the moisture out of the insulation system.
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
More content
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Manufacturing | Real-time condition based monitoring using IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Client Reference | Manufacturing Automotive | Improved Operator Asset Care in Body Shop
By empowering our cell technicians to perform routine non tactical maintenance tasks we have not…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Facilities | Life Healthcare | On Key
On Key has been implemented at more than 50 Life Healthcare hospitals across South Africa…
