Offline and online condition assessments were conducted during the repair process to validate that the workmanship was successfully implemented to the correct standards.
Client Reference | Water Utility | Fixes on Critical Switchgear Components
More content
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Case Study | Manufacturing | Packaging | Equipment Register Review and Criticality Analysis
Nampak is Africa’s largest diversified packaging manufacturer and has been listed on the JSE Limited…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Client Reference | Facilities in Retail | Reducing Compressor Failures | Condenser fan services and voltage protectors
Our client is a large supermarket retailer in Africa with 35 million customers shopping at…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Case Study | Formex | Manufacturing | Automotive
The results of the air leak survey has triggered an energy management drive within the…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
