The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The client approached Martec to conduct a leak detection survey which involved the process of finding, tagging and quantifying leak loss on all compressed air lines in the factory.
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
More content
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Client Reference | Manufacturing Automotive | Improved Operator Asset Care in Body Shop
By empowering our cell technicians to perform routine non tactical maintenance tasks we have not…
Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow
Shell is a national supplier of petroleum products and have a proud record of presenting…
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Client Reference | Manufacturing | Automotive | Spare Parts ABC Criticality Ranking
Our client now has the right type and amount of spare parts available in the…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Case Study | Oil and Gas Retail | Shell | Welcome to Shell Toilet Upgrade Savings
Shell is well known as one of the five major national suppliers of petroleum products.…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
