The LCC model enhances my ability to manage a lean and agile engineering team. This model will ensure healthy components on assets in line with the business strategy, thus improving the overall availability and reliability of the assets. By doing this, production will increase.
Client Reference | Mining | Coal | Life Cycle Costing Model
More content
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Client Reference | Local Government | Metropolitan Municipality | Fleet Management | Optimisting Fuel Consumption
The Pragma Asset Care Centre and the client’s management team focused on and developed areas…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Client Reference | Manufacturing | Automotive | On Key Work Planning and Control on SAP PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Automotive | Improved uptime
With the aid of On Key and the Focused Improvement business process, it assisted us…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
