Complex interfaces between systems were removed that eased the management of large numbers of spare part items across several equipment types and various various types of service contracts.
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
More content
Reference Story | Local Government | Municipality CoCT Waste Water
Our client supplies up to 880 000 m3of water to customers daily. This is a…
Case Study | Retail | Pick n Pay | Making informed decisions, increasing efficiency and saving costs
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Reference story | Municipality | Asset Care Plans on SAP® PM
ACP’s are being identified and implemented in accordance to the asset management strategy.
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Case Study | Manufacturing | Packaging | Work Planning and Control Implementation and Support
Pragma developed a detailed standards manual, including among others: standards for JDE Plant Maintenance configuration…
