The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the maintenance strategy for the crusher based the crushing rate and workload.
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
More content
Case Study | Oil and Gas Retail | Shell | Welcome to Shell Toilet Upgrade Savings
Shell is well known as one of the five major national suppliers of petroleum products.…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
Municipal | Integrating CMMS and municipal systems
On Key has assisted us to manage our daily operations effectively and also to enhance…
Quarries | EAM system optimisation
PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Case Study | Oil and Gas Retail | Shell | Follow Up Work Orders | On Key
Convenient to electronically capture which assets need repairs while on site and peace of mind…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Case Study | Oil and Gas Fuels Retail | Lowering Carbon Emissions
As part of Shell securing its position as the leading global mobility retailer, they have…