Our client is a respected open cast coal mining and processing plant situated in the Mpumalanga region, and it is designed to beneficiate approximately 3.8 million tons of thermal and metallurgical coal per annum. New maintenance plans had to be developed, utilising measuring points to capture real-time machine hours
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
More content
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Case Study | Oil and Gas Fuels Retail | Lowering Carbon Emissions
As part of Shell securing its position as the leading global mobility retailer, they have…
Case Study | Local Government | Municipality | Maintenance Capacity Planning
Our client fulfils a maintenance support function to all divisions within their organisation. The client…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Oil and Gas | Retail | Sasol | Focused Improvement Dashboard
Pragma developed a dashboard to track improvement projects and highlight the combined costs of several…