With the aid of On Key and the Focused Improvement business process, it assisted us in decreasing the downtime at the headliners section.
Automotive | Improved uptime
More content
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Client Reference | Mining and Minerals | Processing | AMIP and Strategy Development for Plants across the Globe
The client s a globally diversified mining and metals company with headquarters in Australia with…
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network,…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
