The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified the need for a comprehensive Physical Asset Management System. In 2007 Pragma Africa were commissioned to establish a pilot Asset Care Centre (ACC) at the recently revitalised Provincial Hospital in George for an assessment period of 18 months.
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
More content
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Client Reference | OEM Packaging | Driving efficiency and standardisation in global maintenance with On Key Plus
The Pragma team supports our client’s global network, consisting of over 8,000 filling machines, nearly…
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers.…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Oil and Gas Retail | Shell | Supplier Savings
The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the…
