The results of the air leak survey has triggered an energy management drive within the company. Employees are made aware of the costs of air leaks and urged to inform maintenance of identified leaks. This drive initiative has improved maintenance planning and prove to have direct impact on reduce wasted expenditure.
Case Study | Formex | Manufacturing | Automotive
More content
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Client Reference | Local Government | Metropolitan Municipality | Fleet Management | Optimisting Fuel Consumption
The Pragma Asset Care Centre and the client’s management team focused on and developed areas…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Reference Story | Local Government | Municipality CoCT Waste Water
Our client supplies up to 880 000 m3of water to customers daily. This is a…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Client Reference | Manufacturing | Automotive | On Key Work Planning and Control on SAP PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Local Government | Metropolitan Municipality | Work Planning and Control on SAP Mobile App
Work Planning and Control managed by the Asset Care Centre (ACC) at a local municipality…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…