Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Client Reference | Manufacturing Automotive | Improved Operator Asset Care in Body Shop
By empowering our cell technicians to perform routine non tactical maintenance tasks we have not…
Proof of Concept | Facilities Management | Smart Building project
We challenged our R&D and FM teams to come up with an intelligent FM solution…
Client Reference | Distributed Facilities | Postal Services | AMIP Assessment
The client is a premier provider of postal and parcel services in the Netherlands. They…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Manufacturing | Packaging | Work Planning and Control Implementation and Support
Pragma developed a detailed standards manual, including among others: standards for JDE Plant Maintenance configuration…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
