Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Client Reference | Manufacturing | Automotive | Spare Parts ABC Criticality Ranking
Our client now has the right type and amount of spare parts available in the…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Case Study | Oil and Gas Retail | Shell | Supplier Savings
The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the…
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Client Reference | Mining and Minerals | Quarries | Maintenance Planning and Scheduling Blended Training
Contact sessions with the facilitator, an experienced Pragma consultant, allowed teams to regroup, share experiences…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…