Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
Our client is a respected open cast coal mining and processing plant situated in the…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Case Study | Oil and Gas Retail | Shell | Welcome to Shell Toilet Upgrade Savings
Shell is well known as one of the five major national suppliers of petroleum products.…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Case Study | Productie Voedingsindustrie | C&D Foods | On-Key-implementatie
Pragma ondersteunt het onderhoudsprogramma On-Key van C&D en stelt het management in staat beter inzicht…