Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure that the installation, offline test and online assessment standards are met and will avoid incorrect replacement that can be costly.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
More content
Client Reference | Local Government | Fleet Management | Insurance Management Tool
Our client required an insurance management tool to manage and report on insurance claims and…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Case Study | Local Government | Municipality | Maintenance Capacity Planning
Our client fulfils a maintenance support function to all divisions within their organisation. The client…
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers.…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Municipality | Fleet Management on SAP® PM
Improved Water and Sanitation Fleet Services management results in improved vehicle availability and reliability.
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
Client Reference | Facilities in Retail | Reducing Compressor Failures | Condenser fan services and voltage protectors
Our client is a large supermarket retailer in Africa with 35 million customers shopping at…