Pragma’s intervention has led to an increase in the number of units completed per day and a decrease in the labour cost per unit. This results in an improvement in workshop productivity/efficiency and a cost saving for the various depots.
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
More content
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow
Shell is a national supplier of petroleum products and have a proud record of presenting…
Chicken processing equipment | After sales
For Meyn, it is important to have a trustworthy single view on our Installed Base…
Client Reference | Manufacturing | Automotive | Focused Improvement
The process we followed was excellent. It helped us identify problems and potential root causes…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
