Pragma’s intervention has led to an increase in the number of units completed per day and a decrease in the labour cost per unit. This results in an improvement in workshop productivity/efficiency and a cost saving for the various depots.
Corrosion Maintenance Time Study | City of Cape Town
More content
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
MV Substation Reliability & Safety | Power Utility
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Mining | Providing a structured, role-based approach to skills development
Our client’s requirement for support with the training and development of their asset management resources…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Asset Tactics Navigation | Coal Mining Client Reference
Our client has a coal open cast mine, with one DMS plant for the beneficiation…
Generator Online Dashboard | Municipality Reference
In this case study, we illustrate how our Asset Health Management for Generators solution assists…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Automotive | Improved uptime
With the aid of On Key and the Focused Improvement business process, it assisted us…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
