Pragma’s intervention has led to an increase in the number of units completed per day and a decrease in the labour cost per unit. This results in an improvement in workshop productivity/efficiency and a cost saving for the various depots.
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
More content
Client Reference | Manufacturing Bottling | Global Beverage Producer: Using Lifecycle Costing for Financial Decision-making
Our client is a global producer of beverages. They package various products on various lines…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Client Reference | Mining and Minerals | Processing | AMIP and Strategy Development for Plants across the Globe
The client s a globally diversified mining and metals company with headquarters in Australia with…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Case Study | Oil and Gas Retail | Shell | Follow Up Work Orders | On Key
Convenient to electronically capture which assets need repairs while on site and peace of mind…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
