This project forms an integral part of the bigger asset management process by highlighting specific focus areas for immediate improvement.
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
More content
Case Study | Oil and Gas Retail | Shell | Supplier Savings
The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Client Reference Story | Local Government Municipality | Generator On-Line Dashboard User Guide
In this case study, we illustrate how our Asset Health Management for Generators solution assists…
Case Study | Oil and Gas | Asset Health Management LPOC Mitigation
Shell takes strong measures to prevent potential environmental damage. One way to mitigate this risk…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
Our client is a leading automotive manufacturer in South Africa. The client embarked on a…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…