The reticulation network at a local municipality has more than 600 pump stations across the region. Key challenges included frequent high failures of equipment with high resulting cost and consequence of critical equipment failure can have a significant negative impact on the public and environment. A criticality analysis was conducted on all pump stations within the reticulation network, and maintenance work is prioritised.
Pump Station Maintenance Plans | Metro Case Study
More content
Operations Readiness Project | Exxaro Case Study
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
IS Machine Maintenance | Nampak Glass Case Study
This project forms an integral part of the bigger asset management process by highlighting specific…
Contractor Management with On Key | Retail Reference
Improving contractor control and rates could result in a potential saving of more than 10%…
Reference story | Retail | Costing Model
One costing model, applied across our 200+ contractors enables us to thoroughly manage/verify invoices.
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Case Study | Retail | Massmart | Making informed decisions, increasing efficiency and saving costs
Massmart is a South African based globally competitive regional management group, invested in a portfolio…
Continuous Miner Utilisation | Coal Mining Reference
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
MV Substation Reliability & Safety | Power Utility
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…
Municipality | Sub-station maintenance
The ACC provided a platform for the staff at ESS to be able to easily…
