Kumba supplies high-quality iron ore to the global steel industry – the key component in steel and the most widely used of all metals.
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
More content
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Client Reference | OEM Packaging | Driving efficiency and standardisation in global maintenance with On Key Plus
The Pragma team supports our client’s global network, consisting of over 8,000 filling machines, nearly…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Client Reference | Local Government | Fleet Management | Insurance Management Tool
Our client required an insurance management tool to manage and report on insurance claims and…
Client Reference | Local Government | Metropolitan Municipality | Fleet Management | Optimisting Fuel Consumption
The Pragma Asset Care Centre and the client’s management team focused on and developed areas…
