Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage

The primary crusher blocked on oversize material and suffered a breakdown that delayed production for over 24hrs. Engineers reviewed and intensified the maintenance strategy for the crusher based the crushing rate and workload.

Download case study