The Distribution Directorate is responsible for the maintenance of and extensions to the distribution network, which includes overhead lines, substations, underground cable networks, street and high mast lighting, gas turbines.
Case Study | Local Government | Municipality | Nelson Mandela Bay | AIV | AMIP | ACC
More content
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
It was a big help to get all the maintenance recommendations from the different equipment…
Case Study | Oil and Gas Retail | Shell | Critical Inspection Animated Training
The CEI clarification animations have become a Practice Worth Replicating in other markets and were…
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
Pragma’s intervention has led to an increase in the number of units completed per day…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
This project forms an integral part of the bigger asset management process by highlighting specific…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Case Study | OEM Packaging | Sidel | Asset Management Improvement Assessment
Pragma’s consultants assessed the maturity of our organisation in a structured manner. The output was…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Reference story | Municipal | AM Maturity Assessment
Shift towards optimal mix of reactive to proactive planned maintenance.
Client Reference | Manufacturing | Real-time Condition Based Monitoring with IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…