The Work Manager app has significantly increased data quality, and velocity as data is entered in real-time once work is completed. All relevant documentation, including site permits and photos, are attached to the work orders, ensuring a much faster turnaround on the full completion of work orders.
Case Study | Oil and Gas Retail | Shell | Work Manager Application
More content
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Efficiency & Cost Savings | Pick n Pay Case Study
Pick n Pay is a fast moving consumer goods retailer based in Africa. They operate…
Insurance Electrical Assessment | Nampak Glass
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Case Study | Oil and Gas | Fuels Retail | Permit To Work Blended Training
The fuels retail sector has a standard health and safety work process for all employees…
Implementing the Pragma Way | Automotive Reference
At our company our goal is to align people’s ambitions to plant strategy, ensuring that…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Spare Parts Optimisation: 34%+ IRR | Hydro Power
Discover how structured, value-based spare parts optimization achieved 34%+ IRR. It improved asset uptime, reduced…
Case Study | Facilities | Life Healthcare | On Key
On Key has been implemented at more than 50 Life Healthcare hospitals across South Africa…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
