Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel pumps from 2012 to 2016.
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
More content
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Client Reference | Manufacturing | Real-time condition based monitoring using IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Case Study | Local Government | Municipality | Maintenance Capacity Planning
Our client fulfils a maintenance support function to all divisions within their organisation. The client…
Coal | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
