Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel pumps from 2012 to 2016.
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
More content
Client Reference | Manufacturing | Glass | Improvement of Asset Care Plan
Our client is a leading manufacturer and supplier of float glass, laminated glass and mirrors…
Case Study | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Chicken processing equipment | After sales
For Meyn, it is important to have a trustworthy single view on our Installed Base…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Client Reference | Manufacturing | Automotive | Integrating the Pragma Way
The client gained improved asset management maturity with individuals taking ownership and accountability for completing…
Client Reference | Manufacturing | Mechanical Condition Assessment | High Volume Printing
A specialised printing entity providing services to government stakeholders realised the need for reliability improvement…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…