See how structured, value-based spare parts optimisation delivered over 34% IRR (and more than 140% in targeted areas), while improving uptime visibility, reducing risk, and freeing up working capital.
Client Reference | CRS Local Government Hydro Power Station – Spare Parts Optimisation
More content
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | OEM-verpakkingen | Sidel | Volwassenheidsscan asset management met verbeteringen
De consultants van Pragma hebben de volwassenheid van onze organisatie op gestructureerde wijze beoordeeld. De…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
Client Reference | Manufacturing | Automotive | Integrating the Pragma Way
The client gained improved asset management maturity with individuals taking ownership and accountability for completing…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Manufacturing Automative | FI on Light Curtains
Analysing data on production stoppages with the assistance of a highly motivated cross functional team,…
Case Study | Oil and Gas Retail | Shell | Facilities Management Centre
Pragma and Shell’s longstanding asset management partnership has resulted in 80% downtime reduction on fuel…
Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis
By defining and documenting failure modes across 32 asset types, the client achieved a structured…
