See how structured, value-based spare parts optimisation delivered over 34% IRR (and more than 140% in targeted areas), while improving uptime visibility, reducing risk, and freeing up working capital.
Client Reference | CRS Local Government Hydro Power Station – Spare Parts Optimisation
More content
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Municipality | Training
The training helped me greatly with the implementation of the asset management improvement project in…
Case Study | Dissolved Gas Analysis Findings of Nampak Glass Transformers
To improve the process of removing the moisture in the transformer oil, a filtration method…
Client Reference | Distributed Facilities | Retail | Contract and Contractor Management | On Key
Improving contractor control and rates could result in a potential saving of more than 10%…
Quarries | EAM system optimisation
PPC’s and Pragma Africa’s new partnership promises to take Strategy Management and Asset Care to…
Client Reference | Mining | Coal | Continuous Miner Utilisation
Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
Reference story | Municipal | AM Maturity Assessment
Shift towards optimal mix of reactive to proactive planned maintenance.
