See how structured, value-based spare parts optimisation delivered over 34% IRR (and more than 140% in targeted areas), while improving uptime visibility, reducing risk, and freeing up working capital.
Spare Parts Optimisation: 34%+ IRR | Hydro Power
More content
Client Reference | Mining | Providing a structured, role-based approach to skills development
Our client’s requirement for support with the training and development of their asset management resources…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Value Add in Gauteng Retail Outlets | Client Reference
The client is one of the largest retailers on the African continent. They have an…
Electrical Condition Assessment | Nampak Glass
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Manufacturing | FoodBev | Libstar | Asset Care Academy
The intent was to create a common understanding of maintenance management among all plant engineers…
Fleet Fuel Optimisation | Metro Municipality Case Study
The Pragma Asset Care Centre and the client’s management team focused on and developed areas…
Client Reference | Mining | Coal | Compliance Dashboard
Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well…
Client Reference | Manufacturing Automotive | Rotable Spares
The new rotable process is well integrated within all shops at our client. An increase…
Corrosion Maintenance Time Study | City of Cape Town
Pragma’s intervention has led to an increase in the number of units completed per day…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
