The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers. Some of these contracts require the client to take responsibility for the maintenance of third party equipment (3PE) that forms part of the full line of equipment.
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
More content
Case Study | Metropolitan Municipality | Pump Station Maintenance Plans
The reticulation network at a local municipality has more than 600 pump stations across the…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Client Reference | Manufacturing | Automotive | Integrating the Pragma Way
The client gained improved asset management maturity with individuals taking ownership and accountability for completing…
Reference story | Health Care | Downtime reduction
Inspection preventive maintenance compliance as per legal and safety standards.
