Analysing data on production stoppages with the assistance of a highly motivated cross functional team, consisting of Facility planners, Pragma Engineers, Maintenance and Production personnel, leading to the brainstorming of all ideas, documenting these ideas and formulating action plans for various tasks and the continuous monitoring and re-evaluation, undoubtedly has far reaching implications to the successful reduction in unnecessary production losses.
Client Reference | Manufacturing Automative | FI on Light Curtains
More content
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Mining | Planning and Scheduling
Introducing the On Key planning and scheduling tool highlighted the amount of unnecessary Work Orders,…
Reference story | Supermarket / Retail Sector Contractor Management
Our client is one of the largest supermarket retailers in Africa, operating from more than…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Referentie | OEM-verpakkingsindustrie | Optimalisatie reserveonderdelen met een SAP- en On Key-gebruikersinterface
Complexe interfaces tussen softwaresystemen zijn verwijderd, waardoor het beheer van grote aantallen (reserve) onderdelen voor…
Client Reference | Local Government | District Municipality | Water | AMIP
Our client is a typical district municipality (DM) in a rural area of South Africa.…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Case Study | Local Government | City of Cape Town | Electrical Support Services | Substation Maintenance
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…