On Key allows us to plan, schedule and allocate tasks to our artisans based on available man hours and we can already see an improvement in our Weekly Scheduled Attainment. This is great for us as we measure our efficiency based on work planned versus work executed.
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
More content
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Municipality | Training
The training helped me greatly with the implementation of the asset management improvement project in…
Client Reference | Mining | Coal | Life Cycle Costing Model
The LCC model enhances my ability to manage a lean and agile engineering team. This…
Client Reference | Mining Coal | FI on Pump Maintenance Strategy
Having control over planned and calculated (predictable) replacements of your assets will reduce lost production…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…