The new rotable process is well integrated within all shops at our client. An increase in transparency and reduction in cost are some of the benefits currently being experienced. Effective equipment performance monitoring is the next challenge. Enhancing the rotable process and making use of system functionality, such as SAP PM Serialization and automation will make this a reality in the near future.
Client Reference | Manufacturing Automotive | Rotable Spares
More content
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Reference story | Automotive | Criticality Analysis
Our client now has better insight into the criticality of their equipment and technologies, to…
Client Reference | Mining and Minerals | Quarries | Maintenance Planning and Scheduling Blended Training
Contact sessions with the facilitator, an experienced Pragma consultant, allowed teams to regroup, share experiences…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Generator Life Cycle Management | Fuel Retail
Assets or components removed from revamped sites are often still fully functional. We are pleased…
Case Study | Mining and Minerals | Anglo American Kumba Iron Ore | Plant Reliability
Kumba supplies high-quality iron ore to the global steel industry – the key component in…
Case Study | Oil and Gas Retail | Shell | Passport Training
Shell is well known as one of the major national suppliers of petroleum products. Shell…
Case Study | On-line condition Assessment Findings of MV Power System (DRUPPS)
Replacement of the feeder cables and terminations under the Pragma quality assurance processes will ensure…
Real-Time Condition Monitoring | Manufacturing IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Client Reference | Manufacturing | Automotive | Reducing High Failure Rate of CE Equipment
By doing proper analysis of all EC Tools per station it could be determined which…
