Our client is a leading automotive manufacturer in South Africa. The client embarked on a journey to implement an asset management system based on the Pragma Way. One part of that system is Focused Improvement and structured problem-solving
Client Reference | Manufacturing | Focused Improvement project addressing high failure rate of equipment
More content
Pump Belt Drive Maintenance | Coal Mining Reference
Focused interventions do not necessarily always have to lead to complex solutions where redesign or…
Electrical Condition Assessment | Nampak Glass
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Fleet Management Service | Municipality Reference
Our client is a metropolitan municipality in Southern Africa with a Fleet Management and Maintenance…
CNV 202 Track Wheel Failure | Coal Mining Case Study
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Corrosion Maintenance Time Study | City of Cape Town
Pragma’s intervention has led to an increase in the number of units completed per day…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Substation Maintenance | City of Cape Town Case Study
The Electrical Support Services (ESS) department is responsible for transformer and switchgear installation and refurbishment,…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Water AMIP | District Municipality Client Reference
Our client is a typical district municipality (DM) in a rural area of South Africa.…