The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were instantly measurable to test the value-add of the maintenance plan.
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
More content
Electrical Condition Assessment | Nampak Glass
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Client Reference | Manufacturing | Automotive | On Key Work Planning & Control on SAP® PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
IS Machine Maintenance | Nampak Glass Case Study
This project forms an integral part of the bigger asset management process by highlighting specific…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Diamonds | Cascade conveyors
Cost savings from elimination of root causes of incorrect cascade positioning failure are calculated to…
Value Add in Gauteng Retail Outlets | Client Reference
The client is one of the largest retailers on the African continent. They have an…
Asset Care Service | Western Cape Health Case Study
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Corrosion Maintenance Time Study | City of Cape Town
Pragma’s intervention has led to an increase in the number of units completed per day…
Pump Station Maintenance Plans | Metro Case Study
The reticulation network at a local municipality has more than 600 pump stations across the…