Our client consists of 4 mid-size coal mines, covering underground, opencast, beneficiation plant as well as discard handling disciplines. Pragma on-site team created the first draft of Excel sheets to monitor the compliance per site and website App development that was created by Pragma AC Engineer.
Client Reference | Mining | Coal | Compliance Dashboard
More content
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Client Reference | Local Government | Municipality | Water | Asset Care Plans at Pump Stations
Engineering is the maintenance division of The Water Department, tasked to ensure that the facilities…
Case Study | Manufacturing Glass | Nampak Glass | FI on IS Machine Maintenance Strategy
This project forms an integral part of the bigger asset management process by highlighting specific…
Case Study | Manufacturing Food and Beverage | Parmalat | CM Leak Detection
Energy costs are monitored by Parmalat management on a monthly basis. The ratios of compressed…
Case Study | Mining | Manganese | Embedded Email Reports
MMC noticed that their personnel use their mobile phones extensively to access their daily reports.…
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Case Study | Mining and Minerals | Coal | Exxaro | Maintenance Readiness Project
The new Belfast mine is a high value-add coal project in the Mpumalanga region, with…
Case Study | Mining | Coal | Primary Crusher Tip Bin Blockage
The primary crusher blocked on oversize material and suffered a breakdown that delayed production for…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…