Our client consists of four mid-size coal mines, covering underground, opencast, beneficiation plant as well as discard handling disciplines. Baseline and standardisation were established, and an easier detection and focus on problematic equipment followed up by root cause analysis.
Client Reference | Mining | Coal | Continuous Miner Utilisation
More content
Client Reference | Distributed Facilities | Postal Services | AMIP Assessment
The client is a premier provider of postal and parcel services in the Netherlands. They…
Reference story | Municipal | AM Maturity Assessment
Shift towards optimal mix of reactive to proactive planned maintenance.
Client Reference | CRS Local Government Hydro Power Station – Spare Parts Optimisation
Discover how structured, value-based spare parts optimization achieved 34%+ IRR. It improved asset uptime, reduced…
Client Reference | Distributed Facilities Retail | Value Add and Cost Savings
We would like to see savings on our maintenance bill as well as fewer product…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Reference story | Municipality | Asset Care Plans on SAP® PM
ACP’s are being identified and implemented in accordance to the asset management strategy.
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Liquid packaging | AM maturity assessment
The Pragma consultants were able to assess the maturity of our organisation in a structured…
Case Study | Oil and Gas Retail | FMC Digitalisation Process Flow
Shell is a national supplier of petroleum products and have a proud record of presenting…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…