Our client is a respected open cast coal mining and processing plant situated in the Mpumalanga region, and it is designed to beneficiate approximately 3.8 million tons of thermal and metallurgical coal per annum. New maintenance plans had to be developed, utilising measuring points to capture real-time machine hours
Client Reference | Mining | Coal | Conversion of TMM Maintenance Plans
More content
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
Pragma’s intervention has led to an increase in the number of units completed per day…
Case Study | Local Government | Breede Valley Municipality | Integrated CMMS and Systems
BreedeValley Municipality is a local municipality located within the Cape Winelands District Municipality. The Electro-Technical…
Client Reference | Mining and Minerals | Smelter Plant Asset Reliability Optimisation
The thoroughness of the new maintenance plan eliminated all guessing. Downtime and production throughput were…
Client Reference | Facilities | Commercial Property | Pragma Service Request App
On Key Action provided a service request app that did away with system complexities and…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Client Reference | Water Utility | Fixes on Critical Switchgear Components
Offline and online condition assessments were conducted during the repair process to validate that the…
Client Reference | Manufacturing Automotive | Improved Operator Asset Care in Body Shop
By empowering our cell technicians to perform routine non tactical maintenance tasks we have not…
Case Study | Oil and Gas | Fuel Retail Digital Transformation
The maintenance management of the Shell fuel retail network is managed via an end-to-end digitally…
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers.…