Our client is a respected open cast coal mining and processing plant situated in Mpumalanga. Our client experienced inefficiencies and challenges with the effective codification of equipment, material and spares for many years.
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
More content
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Reference story | Fast Foods | Increase in statutory SLA of tactical WO’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Reference story | Fast foods | Increase statutory SLA’s
Since the implementation of the initiative, the statutory SLA for work orders completed increased from…
Reference story | Water utility | SAP® PM optimisation
Moving from an unused SAP® PM system to a well-engineered asset management aligned system.
Client Reference | Distributed Facilities | Value Add in Gauteng Retail Outlets
The client is one of the largest retailers on the African continent. They have an…
Client Reference | Food and Beverage Packaging | Asset Care Plan Development
The client is an Original Equipment Manufacturer (OEM) that offers maintenance contracts to their customers.…
Reference story | Retail | Costing Model
The costing model will result in a 28.5% reduction in travel cost and an overall…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Reference story | Airports | Accurate asset register
Our client gained control of their assets and now know what assets they have, their…