Focused interventions do not necessarily always have to lead to complex solutions where redesign or process changes are required. Maintaining the operational environment and the asset maintenance requirements and best practices are the ‘low-hanging fruits’ that can easily be rectified resulting in the designed performance of the asset.
Client Reference | Mining Coal | FI on Pump Belt Drive Maintenance and Basic Conditions
More content
Mining | Mobile work management
Since the roll-out of the application, it has made it much easier to measure work…
Case Study | Facilities | Pragma Office | Standby Generator IIoT Upgrade
Read more about how our Asset Health Management team brought an older generator into the…
Case Study | Mining | Coal | LG Cyclone Feed Pipe
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Engineering Services | Client Support Dashboard and Notification
Our client develops, maintains and monitors integrations between various source systems on behalf of their…
Client Reference | Manufacturing | Automotive | Implementing On Key to Improve Work Planning and Control
On Key is a cost saver because it allows us to become completely paperless and…
Reference Story | Local Government | Municipality CoCT Waste Water
Our client supplies up to 880 000 m3of water to customers daily. This is a…
Client Reference | Manufacturing | Automotive | Implementing the Pragma Way
At our company our goal is to align people’s ambitions to plant strategy, ensuring that…
Case Study | Mining and Minerals | Exxaro | Operations Readiness Project
Operations readiness is the process of preparing the custodians of an asset under construction, and…
Client Reference | Manufacturing | Real-time Condition Based Monitoring with IIoT
The real-time condition monitoring project brought health measures of critical assets within the client’s plant…
Food and beverage | Downtime reduction
Due to the implementation of the level sensor we can see that the OEE started…
