The LCC model enhances my ability to manage a lean and agile engineering team. This model will ensure healthy components on assets in line with the business strategy, thus improving the overall availability and reliability of the assets. By doing this, production will increase.
Client Reference | Mining | Coal | Life Cycle Costing Model
More content
Case Study | Oil and Gas | Volt Current Electrical | Retail Supplier Development
Volt Electrical (Volt) was founded in 2016 as a start-up business and a small to…
Client Reference | Oil and Gas | Commercial Depots Failure Mode and Effects Analysis
By defining and documenting failure modes across 32 asset types, the client achieved a structured…
Client Reference | Oil and Gas Petrochemical Plant | Equipment Maintenance Strategies
Pragma facilitated the successful development of equipment maintenance strategies and tactics, helped convert them into…
Case Study | Oil and Gas Retail | Shell | HSSE Logger
We now remember to look out for potential incidents on site as we can log…
Coal | TH 1 efficiency
The combined effort of our maintenance team, with the facilitation of problem solving led by…
Case Study | Local Government | Department of Health Western Cape | Asset Care Service
The Department of Health Western Cape had, as part of their Hospital Revitalisation Program, identified…
Reference story | Packaging | Maintenance plans
The biggest benefit of this focused improvement project is the reduction in claims placed by…
Case Study | Local Government | Municipality | COCT | Corrosion Maintenance Time Study
Pragma’s intervention has led to an increase in the number of units completed per day…
Client Reference | Mining and Minerals Nickel | Reliability Engineering and Training FI
A multi-faceted approach involving facilitated, on-site training courses plus an on-site reliability engineering service, supplemented…
Client Reference | Manufacturing | Automotive | Reduction in Rear Axle Area Downtime
Our client has better control over breakdowns and appropriate escalation processes is in place in…
