It was a big help to get all the maintenance recommendations from the different equipment manufacturers converted perfectly to the standard and implement them in On Key. All the spares have also been made available in the global system and from there in the different market companies. It was a job very well done I would continue this way each time.
Client Reference | OEM | Packaging | 3PE | Rapid Response | On Key
More content
Reference story | Automotive | Downtime reduction
The Focused Improvement project at the Marriage Station resulted in a deeper analysis of the…
Case Study | Facilities Rental Apartments | Taking control of maintenance with On Key EAM system and Contractor Management
For Ithemba, as a property management company, the main challenge is the return on investment…
Case Study | Power | Renewable Energy | Globeleq | Consulting
The AM framework and associated products are providing GSAMS, as a young business in a…
Client Reference | Local Government | Fleet Management | Insurance Management Tool
Our client required an insurance management tool to manage and report on insurance claims and…
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Client Reference | Power Utility | Improved MV Substation Reliability and Safety with CM
Time to enhance our substation maintenance programme, by identifying and using CM technologies that allow…
Client Reference | Oil and Gas | Natural Gas Reticulation | Boiler Reliability Assessment and Maintenance Plans
Our client identified a problem with reduced operational availability of gas-fired boilers at several provincial…
Client Reference | Mining | Coal | Equipment, Material and Spares Codification Project | SAP
Our client is a respected open cast coal mining and processing plant situated in Mpumalanga.…
Case Study | Manufacturing | Electrical Condition Assessment for Nampak Glass Insurance Requirements
Nampak Glass is a leading glass manufacturer producing glass bottles for the food and beverage…
Case Study | Distribution Facilities | Retail | Pepkor
50% decrease in turn around time to complete work orders Accurate and up to date…