The Pragma team supports our client’s global network, consisting of over 8,000 filling machines, nearly 20,000 downstream pieces of equipment, and an increasing processing asset installed base.
Client Reference | OEM Packaging | Driving efficiency and standardisation in global maintenance with On Key Plus
More content
Case Study | Mining | Coal | CNV 202 Take up Track Wheel Failure
Coal mining operations mine and deliver coal from open cast pit to a crushing circuit.…
Case Study | Oil and Gas Retail | Shell | Supplier Savings
The renegotiation of prices is an important part of Pragma’s supply chain responsibilities on the…
Proof of Concept | Facilities Management | Smart Building project
We challenged our R&D and FM teams to come up with an intelligent FM solution…
Case Study | Oil and Gas Retail | Shell | Work Manager Application
The Work Manager app has significantly increased data quality, and velocity as data is entered…
Case Study | Direct impact of the leak detection survey and repairs estimated at a R 661,672.00 saving per annum
The Parmalat plant in Kyalami produces and packages a number of different yoghurt products. The…
Client Reference | Manufacturing | Automotive | On Key Work Planning and Control on SAP PM
On Key allows us to plan, schedule and allocate tasks to our artisans based on…
Shell | Facilities Management Centre
Continuous verification of the efficacy of energy saving programs based on benchmarks.
Reference Story | OEM Packaging | Cancelled Replaced Spares using a SAP and On Key Interface
Complex interfaces between systems were removed that eased the management of large numbers of spare…
Case Study | Manufacturing FoodBev | C&D Foods | OK Implementation
Pragma allows analysis of maintenance spends per asset, real-time inventory management and fast reporting capability.…
Case Study | Oil and Gas Retail | Shell | Critical Inspection Animated Training
The CEI clarification animations have become a Practice Worth Replicating in other markets and were…
